Part of Ruma-Sabac Highway to Be Built on Columns
Source: eKapija
Thursday, 09.03.2023.
14:17
Comments
Illustration (Photo: CHOTE BKK/shutterstock)
As said in the preliminary design prepared by Institut za puteve AD Beograd, this pertains to the highway section from km 65+300.00 to km 66+970.00.
Based on the hydrological-hydraulic analysis of the impact of the river Sava on the Ruma-Sabac highway, done by the Jaroslav Cerni Water Institute, the optimal solution for the highway’s pass across the river bed, from km 65+300.00 to km 66+970.00, is proposed, says the preliminary design.
The construction of the highway on columns, instead of an embankment, is proposed, on the entire length from the toll booth to the beginning of the access structure on the bridge on the Sava.
Let us remind that the Ruma-Sabac highway, 22 km long, is part of the Ruma-Sabac-Loznica traffic route, which also encompasses the bridge on the Sava, which was connected last summer.
According to the announcements made by those in charge, the Ruma-Sabac section is expected to open to traffic in the autumn.
Take a look at our info-map Construction of Highways and Fast Roads in Serbia and the Region.
B. P.
Lokacija:
Google Maps
Companies:
Ministarstvo zaštite životne sredine Republike Srbije
JP Putevi Srbije Beograd
Institut za puteve a.d. Beograd
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.